PROJECT: PENSKE TRUCKING
scope of work
For this UST pull, Triton completed the following scope of work:

- Obtain permits and create a site health and safety plan
- Excavate and remove two 20,000-gallon USTs
- Line the excavation with filter fabric
- Inert tanks and haul for disposal
- Communicate with client and local regulatory agency
- Backfill and resurface area
©2002-2006 Triton Construction. Site design by Nora Brown Graphic Design.